Tubular Truss, Oxford - Ref 3964
A 30m x 2m tubular steel arched footbridge with tensioned structural cables was installed by CTS Bridges over the River Cherwell at Christ Church College Oxford. The bridge was commissioned by Christ Church College following donations by old members to replace a static punt crossing. The new bridge provides a link between the sports ground and main college building but also allows access by the public. Christopher Lewis, Dean of Christ Church College said 'We are delighted to see the completion of this beautiful bridge, which we believe will greatly enhance Christ Church Meadow and the River Cherwell.
Dimensions
Length; 30m
Width; 2.0m
Client
Avon Construction for Christ Church College, Oxford
Location
River Cherwell, Christ Church College, Oxford